Arlington Park: Studios and Apartments From AED 729,000 in Dubai Land
Majid Developments' Arlington Park is a residential apartment project in Dubai Land Residence Complex, located in the eastern stretch of Dubai. The building offers studios, one-bedroom, and two-bedroom layouts. Construction started in October 2025, with delivery targeted for December 2027.
Dubai Land Residence Complex: The Location in Practice
DLRC sits roughly 25 to 30 minutes from Downtown Dubai and Business Bay via Sheikh Mohammed Bin Zayed Road, and around 35 minutes from Dubai International Airport. It is a suburban, inland community without waterfront frontage or metro access nearby. The community is largely self-contained, with retail and residential services within the master plan. For buyers who prioritize space and value over a central address, DLRC offers a practical trade-off.
For an end-user, daily life here centres around the neighbourhood rather than a commute to a nearby hub. For an investor, the location's distance from prime areas means rental demand will differ from central Dubai addresses, offset by the lower entry cost.
What AED 729,000 Gets You Here
Entry starts at AED 729,000 for studios. Floor areas run from 399 to 466 sq ft, with most layouts clustering around 420 to 445 sq ft. These are compact, functional units suited to a single occupant or a rental investment targeting individuals.
One-bedroom apartments begin at AED 1,114,545, ranging from 828 to 918 sq ft. The premium over the studio tier is approximately AED 385,000 more for roughly double the floor area. At 850 to 900 sq ft, a one-bedroom here works well for a couple or a professional who wants a proper home workspace.
Two-bedroom apartments round out the range, with floor areas from 1,059 to 1,163 sq ft.
The price spread from AED 729K to just over AED 1.1M maps neatly onto three buyer profiles: the entry-level investor seeking a compact rental unit, the young professional or couple wanting room to live properly, and the small family looking for genuine space.
Amenities
| Category | Amenities |
|---|---|
| Wellness | Infinity Pool, Gymnasium, Shared Spa |
| Social | Leisure Lounge, Barbecue Area |
| Convenience | Dining in building, Retail Facilities |
| Work | Work and Study |
Eight amenities cover the key lifestyle categories without excess. The pairing of a Work and Study space with in-building dining and retail signals a project built for residents who spend extended time at home and want daily essentials handled on site. The shared spa and infinity pool give the wellness offering real depth. The barbecue area and leisure lounge provide social infrastructure for a building where residents are likely to interact regularly. As a set, the amenities position Arlington Park for residents who value self-sufficiency within the building over access to the surrounding district.
Delivery: December 2027
Construction launched in October 2025, giving the project a roughly 26-month build timeline to the December 2027 handover. Buyers entering now are committing to an off-plan hold before the property is ready to occupy or lease. That window suits buyers who have time to stage their investment and are not immediately dependent on rental income or occupancy.
Getting In for 20%
Majid Developments offers two payment structures:
| Milestone | Option 1 | Option 2 |
|---|---|---|
| Down payment | 20% | 20% |
| During construction | 40% | 40% |
| At handover | 5% | 40% |
| Post-handover | 35% | 0% |
Both options require the same 20% down payment to book. The difference is what happens at and after handover.
Option 1 keeps only 5% due at keys, with the remaining 35% spread post-handover. This reduces the financial pressure at delivery, which matters if you are managing a simultaneous housing cost during the construction period.
Option 2 settles everything by delivery: 40% at handover, nothing owing afterward. For buyers who can consolidate the full balance by December 2027 and want a clean exit from developer payment obligations, this is the simpler path.
On the studio entry price, a 20% down payment comes to approximately AED 145,800.










