15 Cascade: Studios to Penthouses in Motor City, from AED 871K
Iman Developers launched 15 Cascade in Motor City in early 2025. Construction started in March 2025, with handover expected in September 2028. The project spans studios through four-bedroom penthouses, covering an entry price below AED 900K and a top unit at AED 5.6M.
Motor City: Southwest Dubai's Family Suburb
Motor City sits in the southwest of Dubai, roughly 25 to 30 minutes by car from Downtown and Business Bay. Dubai Marina is typically 15 to 20 minutes. The district is primarily car-dependent; it does not walk to major commercial hubs.
It is a planned, self-contained community with wide streets, greenery, and a slower pace than the city's denser corridors. The Dubai Autodrome sits within the same district. Al Khail Road and Sheikh Mohammed Bin Zayed Road connect residents to the rest of Dubai. Dubai Hills Mall is a short drive, and Dubai International Airport is roughly 30 minutes via the motorway.
Motor City's surrounding development is residential in character, with retail and dining woven into the community. The 15 Cascade amenity set reflects this profile.
AED 871K to AED 5.6M: What the Range Covers
The AED 871,150 entry price buys a studio apartment. Studio units come in multiple layouts, from 422 sq ft to 847 sq ft at the same starting price, which already points to a meaningful spread before property type is even a factor. At the top, AED 5,600,000 secures a four-bedroom penthouse of 5,376 sq ft.
One-bedroom apartments start from AED 1,500,000, in the 780 to 860 sq ft range. Two-bedroom units begin at AED 2,100,000 (1,172 sq ft). Three-bedroom apartments start at AED 3,400,000 (2,961 sq ft).
Above that: three-bedroom duplexes from AED 3,700,000 (3,459 sq ft), four-bedroom duplexes from AED 4,100,000, and the penthouse at AED 5,600,000. The step from one-bedroom to three-bedroom duplex is not only in price. A three-bedroom duplex at 3,459 sq ft is roughly four times the area of a typical one-bed. These are different products for different buyers.
Studios and one-beds are the investment entry points. Duplexes and the penthouse target owner-occupiers who need room to live in the unit, not just hold it.
Unit Overview
| Type | Bedrooms | Starting Price |
|---|---|---|
| Apartment | Studio | AED 871,150 |
| Apartment | 1BR | AED 1,500,000 |
| Apartment | 2BR | AED 2,100,000 |
| Apartment | 3BR | AED 3,400,000 |
| Duplex | 3BR | AED 3,700,000 |
| Duplex | 4BR | AED 4,100,000 |
| Penthouse | 4BR | AED 5,600,000 |
Amenities
| Category | Facilities |
|---|---|
| Fitness | Gymnasium |
| Water | Indoor Swimming Pool |
| Green Space | Landscaped Gardens |
| Dining | Restaurants |
| Family | Children's Play Area |
| Security | CCTV |
Six amenities is a modest list for a project of this scale. The indoor swimming pool is the standout item. It operates year-round regardless of temperature, unlike an outdoor pool that becomes impractical during Dubai's summer months.
The rest of the set is family-residential in character: children's play area, landscaped gardens, on-site dining, and a gym. Nothing in the list targets a short-stay or hospitality profile.
Handover in September 2028
Construction broke ground in March 2025 and has been running since. Expected handover is September 2028. From the current point in 2026, approximately two years of the construction period remain. Buyers entering now take on a shorter remaining wait than at launch, though the handover date itself is unchanged.
In at 20%: The Payment Structure
| Stage | Amount |
|---|---|
| Down payment | 20% |
| During construction | 40% |
| Handover | 40% |
The 20% down payment secures entry. The remaining 80% splits equally between the construction period and handover. The full balance closes at key collection in September 2028, with no post-handover component.

