Glorious Central Residences: Studios to Two-Bedrooms in International City Phase 2
Glorious Future has developed this apartment project within International City Phase 2, a well-established residential community in Al Warsan 4, eastern Dubai. Construction started in March 2024. The project was scheduled for handover in November 2025. Buyers approaching this project now are looking at a delivered or near-delivered building rather than a project still working through its construction phase.
What Living in Al Warsan 4 Actually Means
International City is one of Dubai's larger self-contained communities, sitting roughly 25 to 30 kilometres east of Downtown. That distance is the reason prices here sit where they do. This is not a community built around a prestige address. It is built around practical urban living at a price that works.
Al Warsan 4 connects well to surrounding infrastructure. Dragon Mart is nearby, putting furniture, appliances, and household goods within easy reach. Academic City is a short drive east and draws students, lecturers, and education-sector workers into the surrounding area. Silicon Oasis, the established tech district, is within practical daily commute distance from this address.
The result is a community that suits residents who need Dubai's employment and education infrastructure but are prioritising affordability over location. That combination of accessibility and value makes this address relevant to both owner-occupiers and to investors targeting the residential rental market in this part of the city.
AED 580,000 at the Entry, AED 1.44 Million at the Top
Price runs from AED 580,000 for a studio to AED 1,438,409 for a two-bedroom. The gap between those two figures reflects three separate buyer decisions.
At AED 580,000, a studio is accessible for first-time buyers entering via a mortgage and for investors seeking a low-capital entry into Dubai residential property. The sub-AED 600,000 entry keeps initial outlay modest and suits buyers who want ownership without a large capital commitment upfront.
One-bedrooms start at AED 845,606. This buyer is typically a couple, a professional who needs a second room, or an investor who wants a slightly larger unit with broader tenant appeal.
At AED 1,438,409, the two-bedroom is a longer-term position. This is typically a small family buying to occupy, or an investor targeting family or dual-occupancy tenancy over a multi-year hold.
Three Unit Types, Three Buyer Profiles
All units are apartments. Three configurations cover the full price spectrum:
- Studios from AED 580,000 suit first-time buyers and yield investors targeting single professionals.
- One-bedrooms from AED 845,606 work for couples, professionals needing a second room, and mid-range investors.
- Two-bedrooms from AED 1,438,409 attract small families and longer-hold investors targeting family occupancy.
What the Amenity Set Tells You About This Project
| Category | Amenities |
|---|---|
| Leisure | Indoor Swimming Pool, Landscaped Gardens |
| Fitness | Gymnasium |
| Family | Children's Play Area |
| Convenience | Restaurants, Retail Facilities |
| Safety | Security |
Seven amenities across five categories. The indoor swimming pool is the standout at this price range. Paired with the gymnasium, children's play area, and landscaped gardens, the amenity package signals a development aimed at active, family-oriented residents rather than a purely transient or investment-focused buyer base.
The on-site restaurants and retail facilities address a practical gap. International City Phase 2's location means major external retail clusters require a drive, so having food and convenience options within the development adds genuine daily value for residents.
November 2025 Handover: Where This Project Stands Now
Construction began in March 2024 with expected completion in November 2025. The project has passed its scheduled handover date. Buyers entering now are looking at a delivered or near-delivered asset, not a long off-plan wait.
For investors, this changes the investment profile. Construction risk is no longer the primary variable. The path to rental income is short compared to projects still mid-build. For owner-occupiers, the timeline from purchase to moving in is driven by unit availability rather than build progress, which is a practical advantage at this stage.








