Gate Royale Residences: Baron Development's Al Furjan Off-Plan
Baron Development is delivering Gate Royale Residences in Al Furjan, on the southwestern edge of Dubai. The project offers apartments and a duplex format, with prices starting at AED 949,000, construction underway since June 2025, and handover scheduled for June 2027.
Al Furjan: Metro Access and the Western Corridor
Al Furjan has its own station on the Route 2020 metro line, linking the district to Expo City and Jebel Ali, with onward access to the broader Dubai metro network. Sheikh Zayed Road and the Mohammed bin Zayed City interchange are nearby, giving road access in both directions: Dubai Marina to the north and the Abu Dhabi highway to the southwest. Ibn Battuta Mall is the nearest major retail destination, and Discovery Gardens and Jumeirah Village Circle are adjacent residential communities.
The district is established and predominantly residential. The metro station is the strongest infrastructure asset for buyers who commute or want flexibility without relying on a car. The district draws both end-user residents and investors, with metro access and mid-range pricing supporting both use cases.
What AED 949K to AED 3.1M Gets You
| Type | Bedrooms | Size | Starting Price |
|---|---|---|---|
| Apartment | 1BR | 698 sq ft | AED 949,000 |
| Apartment | 2BR | 990 sq ft | AED 1,300,000 |
| Apartment | 3BR | 2,019 sq ft | AED 2,400,000 |
| Duplex | 3BR | 2,688 sq ft | AED 3,100,000 |
The range from AED 949K to AED 3.1M reflects genuinely different products at each price point. The 1-bedroom at 698 sq ft and under AED 1M is the entry point, accessible to a broad pool of buyers and smaller investors. The 2-bedroom at 990 sq ft and AED 1.3M suits couples or small families. The 3-bedroom apartment at 2,019 sq ft and AED 2.4M is the full family-sized option on a single floor. The 3-bedroom duplex at 2,688 sq ft across two floors for AED 3.1M is the top unit, offering floor-level separation that a standard single-storey layout does not provide.
Seven Amenities, Pitched at Families
| Category | Facilities |
|---|---|
| Outdoor | Landscaped Gardens, Children's Pool |
| Fitness | Gymnasium |
| Retail & F&B | Restaurants, Retail Facilities |
| Parking & Security | Covered Parking, Security |
Seven amenities, with on-site restaurants and retail among them. Having food and retail within the development reduces reliance on the surrounding area for everyday needs. The children's pool and landscaped gardens point toward a family-oriented resident profile. The gymnasium and security round out a functional, mid-range amenity set. Baron is positioning the project at practical family residents, not lifestyle buyers seeking an extended amenity suite.
Twenty-Four Months to Handover
Construction started in June 2025. The expected handover is June 2027, a 24-month build period. Buyers entering now do so at the beginning of the construction cycle, with two full years before physical delivery.
That window covers the full construction payment schedule, meaning buyers who sign now have roughly 24 months of construction-phase payments ahead before the large handover tranche falls due.
Getting In for 10% Down
| Phase | Amount |
|---|---|
| Down payment | 10% |
| During construction | 40% |
| Handover | 50% |
The 10% down payment keeps the initial outlay low. The remaining 90% splits between the construction phase (40%) and a single 50% payment at handover in June 2027. No post-handover installments follow. The structure concentrates half the purchase price at the point of delivery, with no staged relief after that date.









