Nautica Phase 2: Waterfront Apartments by Select Group in Maritime City
Select Group is behind the Nautica development in Dubai Maritime City, and Nautica Phase 2 is the second residential release within it. The project consists entirely of apartments, positioned within the Nautica Two subzone on the Dubai coastline.
A Coastal Location Outside the Main Marina Corridors
Maritime City sits on the Dubai coastline, between Port Rashid and the approach to the city centre. From here, Downtown Dubai and Dubai International Airport are each roughly 20 minutes by road. Dubai Marina and JBR lie further west, placing residents outside those high-density corridors while keeping major employment hubs and transit connections within reach.
The immediate surroundings are maritime in character. Port Rashid lies immediately adjacent, and the district incorporates marina and coastal infrastructure throughout. Residents choosing this location are not selecting a tower with a waterfront name. The water is physically present.
For buyers whose primary daily movements are toward Downtown, Deira, or along the Sheikh Zayed Road corridor, this location is practical. The private marina berths in the amenity set reinforce the coastal identity in concrete terms.
What AED 1.68 Million to AED 2.54 Million Reflects
All units are apartments. Pricing runs from AED 1,683,844 at entry to AED 2,540,721 at the top, a spread of roughly AED 857,000 across one property type. The gap between the lowest and highest price represents approximately 51% of the entry figure. Within a single property category, that is wide.
The lower price corresponds to smaller units or lower floor positions. The upper range covers larger floor plans or higher floors. Within a waterfront building, floor position and aspect affect the daily experience materially. A buyer at AED 1.68 million and a buyer at AED 2.54 million are purchasing different things within the same address, and the exact unit matters more here than the headline range.
Amenities
| Category | Facilities |
|---|---|
| Fitness & Wellness | Running Track, Well-being and Fitness, Shared Gym, Hotel and Spa Facilities, Shared Spa |
| Water & Leisure | Shared Pool, Private Marina Berths, Barbecue Area |
| Family | Children's Play Area |
| Retail | Retail Facilities |
The private marina berths are the defining feature of this amenity set. They provide functional water access that connects directly to the project's coastal position. The hotel and spa facilities alongside a shared spa and gym place the leisure offering at a quality level above a standard residential building. The running track and barbecue area complete an outdoor dimension to the package. Across ten amenities, the project is targeting a resident who will actively use what the building provides, not one treating the apartment as a passive asset.
Near-Term Handover: December 2026
Construction began in October 2023. Completion is expected in December 2026, approximately six weeks from now. For any buyer entering at this stage, this is a delivery-stage purchase rather than a long off-plan commitment. The build execution is substantially complete. The buyer can assess the project in near-final form rather than relying entirely on floor plans and renders.
This timing shapes the financial picture directly.
Getting In at 20%
| Stage | Payment |
|---|---|
| Down payment | 20% |
| During construction | 20% |
| At handover | 60% |
The 20% down payment secures the unit. Another 20% is distributed across the construction period, which is nearly complete at this point. The structure places 60% of the purchase price at handover, and with handover set for December 2026, that final payment falls within weeks. Buyers entering now are committing to that 60% almost immediately rather than building toward it across a longer construction period.























