Binghatti Elite is a residential apartment development by Binghatti Developers in Dubai Production City (IMPZ). Construction started in December 2024. The project is scheduled for completion on 31 July 2026, approximately two weeks away, which puts it in the final stretch of its off-plan lifecycle.
Dubai Production City: What the Location Delivers
Dubai Production City sits in the western stretch of Dubai, near Sheikh Mohammed Bin Zayed Road. The district falls roughly between Dubai Marina to the northwest and the residential corridors of Al Barsha and JVC to the east. From here, Mall of the Emirates runs around 15 minutes by car. Downtown Dubai and Dubai International Airport are typically 25 to 30 minutes without peak-hour traffic. For residents who commute toward Media City, Internet City, or Dubai Hills, this location keeps those journeys manageable.
The free zone nature of IMPZ gives this part of Dubai a different character from more residential-only areas nearby.
Studio and One-Bedroom Apartments at AED 1,124,999
Units in Binghatti Elite are listed at AED 1,124,999. The project offers both studios and one-bedroom apartments. Studio footprints sit at around 376 sq ft. One-bedroom layouts span a notably wide range: the most compact plans start below 250 sq ft, while larger configurations reach above 800 sq ft. That spread means a buyer focused on minimal footprint and a buyer looking for more living space can both find something here at the same listed price. In practice, the size you choose determines the per-square-foot rate you pay rather than the headline number.
What the Amenity Set Tells You
| Category | Amenities |
|---|---|
| Wellness | Indoor Swimming Pool, Gymnasium |
| Outdoor | Landscaped Gardens, Children's Play Area |
| Lifestyle | Restaurants |
| Security | CCTV Security |
The indoor pool is the element that sets this list apart. The rest cover the daily needs of a permanent resident: fitness, outdoor space for children, dining on-site, and security coverage. An indoor facility runs year-round, including through Dubai's summer months when outdoor pool use drops sharply.
This is an amenity set built for residents who plan to live in the building. The children's play area combined with the indoor wellness offering points toward families and longer-stay professionals as the core resident profile, rather than short-stay guests.
Handover on 31 July 2026
Construction started in December 2024 and is due to complete at the end of this month, a roughly 20-month build cycle. The project is in its final days as an off-plan offering. For buyers entering now, the construction-phase risk that shapes most off-plan decisions has largely passed. What remains is the handover process itself. The expected completion of 31 July 2026 has not yet been reached, so this is technically still an off-plan purchase, but one where the construction variable is nearly resolved. Compared to projects still mid-build, the timeline exposure here is minimal.
Four Payment Options, Starting at 20% Down
| Option | Down Payment | During Construction | At Handover |
|---|---|---|---|
| Option 1 | 20% | 50% | 30% |
| Option 2 | 50% | - | 50% |
| Option 3 | 50% | 50% | - |
| Option 4 | 70% | - | 30% |
Option 1 is the lightest entry at 20% down (approximately AED 225,000), with 50% spread across construction milestones and 30% due at handover (approximately AED 337,500). With handover two weeks out, the construction-phase installments on this option are at or near their final stage.
None of the four options carry a post-handover payment period. Every buyer clears the full purchase price by the time keys are issued. There is no deferred balance after handover on any option. Buyers own the unit outright from day one. Option 4 at 70% upfront reduces the payment schedule to two phases and removes construction milestone tracking entirely, at the cost of higher initial capital commitment. Options 2 and 3 each split the total across two phases as well, with different sequences depending on whether you prefer to front-load the commitment or spread it across the build period.