Azizi Noura: A Jebel Ali Apartment for AED 570,000
Azizi Noura is a residential apartment project by Azizi Developments in Jebel Ali, Dubai. It is priced from AED 570,000 and the down payment is 10%. In a Dubai off-plan market where 20% is the standard at launch, that halved requirement is the clearest reason to look at this project first. It lowers the immediate capital outlay from roughly AED 114,000 to AED 57,000, a meaningful gap for anyone deploying funds across multiple assets or stepping into off-plan for the first time. Construction started in September 2025. Handover is targeted for December 2027.
Jebel Ali: The Western Corridor
Jebel Ali occupies the western end of Dubai, roughly 35 to 40 kilometres from Downtown. The district runs along Sheikh Zayed Road and is served by the metro. The Jebel Ali Metro station provides a direct rail link to Dubai Marina, JLT, and the city centre. For residents without a car, the metro is the main route into the city.
Expo City, the mixed-use district built on the Expo 2020 site, is a short drive to the east. Al Maktoum International Airport is in the same general corridor. The location is not central, and that is a real consideration. A commute from here to DIFC, Downtown, or Business Bay runs 40 to 50 minutes each way. For buyers who value urban proximity above all else, that is a meaningful cost. For buyers prioritising space and lower pricing over a central address, this end of Dubai has a different logic.
What AED 570,000 Gets You
The project lists AED 570,000 as both minimum and maximum price. Unit configurations include studios at 264 sq ft, one-bedrooms at 537 sq ft, and two-bedrooms at 820 sq ft. A single price across multiple unit sizes suggests the AED 570,000 is the studio entry. At this level, the project targets first-time buyers looking to step into ownership and investors seeking a lower AED entry into Dubai's residential market.
What's on Site
| Category | Amenities |
|---|---|
| Recreation | Indoor Swimming Pool, Gymnasium |
| Outdoor | Landscaped Gardens, Barbecue Area |
| Family | Children's Play Area |
| F&B | Restaurants |
The indoor swimming pool is the standout facility. Outdoor pools in Dubai are seasonal by nature; the summer heat renders them impractical for months at a time. Year-round indoor access is a practical advantage for residents who plan to use it regularly, not just in winter. The on-site restaurants add convenience for a location that sits away from the walkable retail density found in Marina or JLT. The landscaped gardens and barbecue area extend usable outdoor space into the cooler months. Taken together, the gym, green space, play area for children, and dining option create a self-contained environment that works well for families and professionals who do not rely on the surrounding neighbourhood for their daily needs.
December 2027 Handover
Construction at Azizi Noura began in September 2025. Expected completion is December 2027, a 27-month build period. For an off-plan buyer entering today, there are roughly 17 months of remaining construction before delivery. The installment schedule runs across that window, distributing the 40% construction tranche over the build period before the larger handover payment falls due.
Getting In for 10%
| Stage | Payment |
|---|---|
| Down payment | 10% |
| During construction | 40% |
| Handover | 50% |
AED 57,000 secures a unit here. The 40% construction tranche spreads across the build period in stages. The remaining 50% is due at handover in December 2027, the largest single payment in the schedule and the point at which the full balance clears. There is no post-handover plan. A mortgage buyer needs financing approval in place before December 2027. A cash buyer needs the full balance available at delivery.









