MAK I'Sola Bella: Getting In for 10% in JVC
Al Hadaf Properties began construction on MAK I'Sola Bella in Jumeirah Village Circle in September 2024. The project occupies District 18, a residential sub-district within JVC. Target completion is September 2027, making this a three-year build from start to handover.
The pricing, unit mix, and amenity set position this as a mid-market apartment building with practical facilities. Studios, one-bedrooms, and two-bedrooms cover a broad range of buyer profiles within a single building.
Getting In for 10%
The payment structure puts a low bar at entry:
| Stage | % Due |
|---|---|
| Down payment | 10% |
| During construction | 40% |
| At handover | 50% |
10% secures the unit. The 40% during construction spreads over the three-year build period. The remaining 50% falls due at handover in September 2027.
The 10% down payment is the headline here. For a buyer at the two-bedroom end, the 50% at handover translates to roughly AED 718,000 on the top-priced unit. That 50% at handover defines the total cash commitment at completion.
What AED 618K to AED 1.44M Buys Here
Prices span AED 617,948 to AED 1,435,851. The spread tracks three distinct unit tiers.
Studios sit at the lower end of the range, at approximately 411 to 413 sq ft. One-bedroom apartments range from 729 to 885 sq ft, starting at around AED 999,000. Two-bedrooms reach 1,115 sq ft, capped at AED 1,435,851.
The studio buyer here is typically yield-focused, entering JVC at a compact price point. One-bedrooms suit a professional resident or a buy-to-let investor targeting longer tenancies. Two-bedrooms at 1,115 sq ft are solid family-sized apartments at a competitive price relative to more central Dubai locations.
Apartments in District 18, Jumeirah Village Circle
JVC sits between Al Khail Road and Mohammed Bin Zayed Road in central Dubai. From District 18, Dubai Marina is about 15 minutes by car. Downtown Dubai and Business Bay are roughly 20 minutes. Dubai International Airport is approximately 30 minutes.
JVC is a large residential community with apartments, townhouses, and street-level retail spread across its sub-districts. District 18 is a quiet residential pocket within that framework. The location sits between the central Dubai hubs and the outer ring, offering more space per dirham than Marina or Downtown.
Studios, One-Bedrooms, and Two-Bedrooms
All units at MAK I'Sola Bella are apartments. The mix runs from studios to two-bedrooms.
Studios at roughly 411 sq ft are functional for a single occupant and appropriately sized for the rental market. One-bedrooms at 729 to 885 sq ft provide a meaningful step up in living space without tipping into premium pricing. Two-bedrooms at 1,115 sq ft give a small family or a buyer who needs a home office the room to work with.
Each tier targets a distinct buyer. The spread from around AED 618K to AED 1.44M means this building can address first-time buyers, investors, and owner-occupying families at the same time.
What the Amenities Say About This Building
| Category | Facilities |
|---|---|
| Wellness | Indoor Swimming Pool, Jacuzzi & Steam, Gymnasium |
| Outdoor | Landscaped Gardens, Children's Play Area |
| Convenience | Visitor Parking, Restaurants, CCTV Security |
The indoor pool and jacuzzi and steam room are the standouts at this price point. In Dubai's summer months, an indoor pool is genuinely used; an outdoor-only setup is not. The gymnasium, landscaped gardens, and children's play area round out a practical daily-use package. On-site restaurant access within the building adds a practical convenience layer.
The amenity set targets residents and families who want practical daily facilities handled inside the building. Visitor parking and CCTV round out a setup suited to long-term occupancy rather than transient use.
Three Years to Handover
Construction started in September 2024. Completion is targeted for September 2027. Three years remain on the build clock from the start date.
For an off-plan buyer, the construction-phase payments of 40% spread across that window. Handover in Q3 2027 is the target completion date.