Villa 55, Al Wasl: A Fixed-Price Villa at the Heart of Residential Dubai
Vakson Group and the Al Wasl Setting
Villa 55 is a single villa developed by Vakson Group in Al Wasl. The district sits in central Dubai, running along Al Wasl Road between the Sheikh Zayed Road corridor and the Jumeirah coastline. Safa Park borders the south, City Walk sits to the north, and the Jumeirah beach strip is a short drive west.
Daily life here is well-connected without feeling dense. Downtown Dubai and DIFC are roughly fifteen minutes east in normal traffic. The beach is five minutes in the other direction. The streets are predominantly low-rise, with villas and mid-density residential buildings rather than towers. That built environment gives Al Wasl a quieter character than the major commercial clusters nearby.
The district is mature and established. Its residential fabric has not changed dramatically over the years. For buyers who want a central Dubai address with stable surroundings, that consistency is a practical feature of the location.
One Villa, One Price
Villa 55 is listed at a fixed price of AED 35,000,000. This is a single-villa development. No unit mix, no floor options, no pricing tiers. One property, one number.
At AED 35 million in Al Wasl, this sits in Dubai's high-end residential tier. The price, location, and villa format together point to a specific buyer: a high-net-worth household seeking a substantial central-Dubai villa for primary use or long-term holding. Single-product developments simplify the purchase decision. There is nothing to compare within the project itself.
What the Amenity Set Says About the Resident
| Theme | Amenities |
|---|---|
| Recreation & Wellness | Indoor Swimming Pool, Gymnasium |
| Outdoor & Landscape | Landscaped Gardens |
| Dining | Restaurants |
| Family | Children's Play Area |
| Security | CCTV Security |
An indoor pool and gymnasium are standard expectations at this price point. The more telling inclusions are restaurants and a children's play area within the project boundary. Together they describe a household that wants daily conveniences managed on-site. The amenity mix points to a family living in the villa full-time.
Eleven Months to Handover
Construction began on 19 October 2026, with expected completion on 30 September 2027. The build window is eleven months from start to delivery.
That is a short off-plan run. The project just broke ground. A buyer entering now commits at the very start of construction and expects keys in under a year. The short timeline limits the period during which the buyer holds an uncompleted asset.
The Payment Structure: Two Stages, No Tail
| Stage | Percentage | Amount (AED) |
|---|---|---|
| During construction | 60% | 21,000,000 |
| Handover | 40% | 14,000,000 |
The schedule has two phases. 60% is due across the construction period and 40% is due at handover.
With the build running eleven months, the AED 21 million construction tranche is drawn over a relatively compressed timeframe. The AED 14 million at handover is the single largest payment of the two. After delivery, no further payment obligations exist. The full purchase price settles at or before handover, and the transaction closes at that point.









