Azizi Milan: Studios and Duplexes in City of Arabia from AED 560,000
Azizi Milan is a residential development by Azizi Developments in City of Arabia, a master-planned district in eastern Dubai. The project runs from compact studios to three-bedroom apartments, with duplex units in the mix. Handover is targeted for June 2028.
City of Arabia: Eastern Dubai with E311 Access
City of Arabia sits along Sheikh Mohammed Bin Zayed Road (E311) in the eastern stretch of Dubai. Academic City and Dubai Silicon Oasis are nearby to the north. Downtown Dubai is roughly 30 minutes by road; Dubai Marina is at a comparable distance in the other direction. Global Village is a short drive, which adds a seasonal draw for residents.
The location is not a premium central address. For buyers or investors focused on eastern Dubai, that is not a drawback. For those commuting daily into central business districts, the 30-plus-minute drive from City of Arabia is the real variable to weigh.
Entry at AED 560,000 for a Studio
The published price is AED 560,000 for the studio at 322 sq ft. This is the entry point into the project and accessible to first-time buyers and investors looking at Dubai's off-plan market.
The project spans a wide size range: 1-bedroom apartments at 582 sq ft, 2-bedroom apartments at 933 sq ft, 3-bedroom apartments at 1,372 sq ft, and 2-bedroom duplexes. Larger units move the buyer profile toward families and owner-occupiers. The duplex format is a distinct option within the building, suited to residents who prefer a split-level layout.
Ten Amenities Across Wellness, Social, and Family
| Category | Amenities |
|---|---|
| Wellness | Indoor Swimming Pool, Jacuzzi & Steam, Shared Spa, Gymnasium |
| Social & Leisure | Cinema, Restaurants, Landscaped Gardens |
| Family | Children's Play Area |
| Building | Security, Lobby in Building |
Ten amenities cover a broad range for a project at this price point. The wellness stack (pool, spa, jacuzzi, gym) handles health and fitness within the building, removing the need for external memberships. A cinema and in-building restaurants add social options without leaving the building. Landscaped gardens provide outdoor space alongside the indoor facilities. A children's play area makes this a workable environment for families, not just single investors. The overall profile targets residents who want building-level convenience and lifestyle support.
Handover in June 2028: Two Years Out
Construction started in October 2025. Expected completion is June 2028, a build period of just under three years. Buyers entering in mid-2026 are roughly two years from delivery.
The asset does not generate income until it is handed over. For investors tracking yield from a specific date, June 2028 is the start point.
Getting In for 10%: Two Payment Plans
Two payment structures are available:
Option 1
| Milestone | Payment |
|---|---|
| Down payment | 10% |
| During construction | 50% |
| Handover | 40% |
Option 2
| Milestone | Payment |
|---|---|
| Down payment | 10% |
| During construction | 60% |
| Handover | 30% |
Both plans start at 10% down, keeping the upfront commitment contained. Option 1 holds back a larger share for delivery, with 40% due at handover. Option 2 pays more during construction and reduces the final payment to 30%. There is no post-handover component on either plan; the full price is settled by delivery.










