Getting In for 5%: Safa 1 By Arada in Sharjah's Aljada
ARADA's Safa 1 is a residential apartment project in Aljada, a planned district in Sharjah. The project covers 1, 2, and 3-bedroom configurations across multiple unit layouts. The payment structure leads the conversation for most buyers: a 5% down payment secures a unit off-plan.
Aljada, Sharjah: What This Location Delivers
Sharjah shares a land border with Dubai, placing Aljada within road reach of Dubai's employment clusters, retail centers, and international airport. The Sharjah-Dubai corridor is a heavily trafficked route, and peak-hour journey times reflect that. For daily commuters to Dubai, the location balances lower entry costs against time on the road.
For buyers based within Sharjah, the calculation shifts. The emirate has its own commercial centers, government and private-sector employment, and a growing residential base. Aljada's position within Sharjah's urban network connects residents to routes running toward both Dubai and the Northern Emirates.
AED 1.58M to AED 2.36M: Reading the Spread
The price range from AED 1,581,000 to AED 2,363,000 reflects the unit mix across three bedroom types. 1-bedroom apartments start at AED 1,581,000, covering floor areas from 805 to 948 sq ft. 2-bedroom units begin at AED 1,606,000 across layouts from 1,115 to 1,667 sq ft. 3-bedroom apartments start at AED 2,363,000 at approximately 2,222 sq ft.
The spread is primarily driven by size and configuration rather than building tier variation. A buyer at the low end is typically an investor or first-time owner-occupier. The 2-bedroom suits a small family or professional couple who need space beyond a single bedroom. At the top of the range, 3-bedroom buyers secure floor areas between 2,222 and 2,232 sq ft in apartment form.
Seven Amenities, One Clear Resident Profile
| Category | Amenities |
|---|---|
| Fitness | Gymnasium, Indoor Swimming Pool |
| Outdoor & Social | Landscaped Gardens, Barbecue Area, Children's Play Area |
| Dining | Restaurants |
| Security | CCTV Security |
An indoor pool extends usability year-round. On-site restaurants give residents a dining option without leaving the building. The children's play area and barbecue space together point toward families as the primary target resident, people who want organized amenity within the building rather than seeking it outside.
Construction in Progress: September 2027 Handover
Construction started in January 2025. Expected completion is September 2027. As of today, the project has been under active construction for approximately 20 months.
An off-plan buyer entering now faces approximately 12 months to handover. The build schedule is active and running, with completion now closer than the start date.
Getting In for 5%
| Stage | Payment |
|---|---|
| Down payment | 5% |
| During construction | 30% |
| On handover | 65% |
A 5% down payment means the initial outlay on a AED 1,581,000 apartment is approximately AED 79,000 to lock in. The 30% construction installments spread across the remaining build period through 2027. The remaining 65% falls due at handover in September 2027. For buyers financing through a mortgage, this structure concentrates the main capital commitment at the point of ownership transfer, not at signing.




















